Client Details

Company Name
Address line 1
Address line 2
Post Code
Contact Name
Telephone
Email
Brief Project Description
 
Continue

Project Parameters

Number of Operational Hours
 
Area Mon Tue Wed Thu Fri Sat Sun All Days Same as Monday
+
Annual Shutdown Days
Continue

Existing Equipment

Area Lamp Type Qty Circuit Watts Lamp Lumens Motion Control Daylight Control
 
Continue

Proposed Equipment

Area Lamp Type Qty Circuit Watts Lamp Lumens Motion Control Daylight Control Item Cost (Ea) Replacement Cost (Ea)
 
Continue

Switching

Area Movement Sensor Occupancy Percentage Dimming Percentage
 
 
Continue

Report

Running Costs Existing Installation Proposed Installation
Total Luminaire Quantity
Annual Energy Consumption (kWh)
Annual Energy Costs (£)
 
Maintenance Costs    
Lamp Replacement Costs (£)
 
Annual Savings    
Due to Reduced Lighting Load  
Due to Reduced Maintenance Costs  

All calculations have taken into account a standard cost of £0.08 per KWh.